CAPACITY
PLANNING
The
ABBASOFT Technologies Capacity Planning
module calculates shop floor loads based
on open work orders and current shop
loads. Base capacities are established in
the work center file. The capacity
planning module allows forward finite and
backward infinite scheduling, providing
shop loading as well as calculated
delivery dates. Forward and backward
scheduling from a critical work center is
also available. The Capacity Planning
module takes input from the Manufacturing
(Job Cost), Production Control, Project
Management, Router Control, and Shop
Floor Control modules. The Order
Processing module is also recommended for
optimal system operation.
KEY
BENEFITS
- Define
capacity for direct labor and
resources to insure proper
distribution.
- Calculate
requirements plan to provide for
resource demands.
- Analyze
overloads and shortages to
maximize capacity usage.
Capacity
Planning Features
| Operation
adjustments can be made including
set-up, run, and move times by
individual product. Adjustments
to work centers or operation
values are automatically
accessible to associated Routers.
- Work
Center Rate (Dollars).
- Outside
Processing Costs.
- Number
or shifts per day.
- Work
Center rapacity allows
new shop loads calculated
by work center.
Forward
Explosion places work order ship
dates in the future while
Backward Explosion holds ship
dates firm, showing work center
overloads.
|
Explosion
results and daily shop schedules
are available through detailed
reports that display to the
terminal or printer. The
explosion routines perform the
actual calculations and provide:
- New
projected ship dates for
work orders
- Shop
overloads
- User-determined
adjustments
And
Maintain...
- Sales
order and line item
numbers
- Vendor
number for outside
processing
- Work
Order priority code
|
Forward
and Backward Scheduling Features
- Work
Center unit of measure
maintained
- Second
capacity (pounds) filed
for Work Center
- User-specified
override of order
promised date with reason
|
- Roll
and record promise date
transaction
- Display
firm promised dates
exceed capacity
- User
prompt for finished part
lot or serial number
|
Shop
Load Schedule
- Displays
Work Center unit of
measure and PPSU (pieces
per set-up)
- Report
Work Center by day or
week
|
- Forward
time phase schedule chart
for one work order
throughout the shop floor
- Backward
bar chart schedule for
Work Center capacity in
days or weeks
|
Flag
Selectable Controls
- Default
Hours for Work Center
Maximums
- Calculations
based on Open Quantities
or Status
|
- Auto
Rescheduling of Past Due
Forward Status Dates
- Adjust
Work Order Dates from
Critical Work Centers
|
Reports
| Daily
Shop Schedule: |
Lists
user-selectable information
fields for the daily schedule by
warehouse, work center,
department, or part number. |
| Scheduled
Completion Dates: |
Lists
work orders by status and
reschedule code. Includes a
comparison of original due dates
and capacity planning forward
reschedule dates. |
| Work
Center Load: |
Represents
the capacity to which a selected
work center will be filled over
the next eight weeks in bar chart
format. |
| Forward/Backward
Explosion: |
Four
separate explosion reports allow
the user to select forward or
backward explosion of production
schedules for specified date
ranges, warehouses, supervisors,
work centers, and work orders.
These reports display in a
graphical format. |
|