| Maintain
new and old part standards for
any part with Labor, Materials,
and Outside Processing costs plus
burden associated with any of the
three categories. Total cost and
the date the standard was last
changed is also displayed
automatically. Detailed
item specifications that include
part types, scrap percentages,
lot or serial tracking, obsolete
status, bin number, receiving
inspection, and product
categories provide extensive
on-line information at a glance.
Quantity
status is maintained in the Part
Master file for:
- Quantity
On-hand
- Quantity
in Receiving Inspection
- Quantity
on Purchase and Work
Orders
- Total
Required
- Total
Committed
- Total
Available
Calculate
Test, Standard, or Cumulative
Standards allows one single part
or all parts to be rolled up
through a single option.
Information from the Bill of
Materials, operation, work
center, and router are used to
calculate the new standard cost
for the part. A listing to the
terminal shows individual costs
by part for:
- Part
Number
- Labor§
Material
- Outside
Processing
- Burdens
|
Values
produced through the calculation
standards are automatically
entered into the part master
record and the Part Standard
records for each part are
updated, shifting current costs
for a part into the
"old" standard cost. A
product cost report provides
detailed cost information to the
printer for one or all parts. The
report can be generated for any
number of assemblies and
includes:
- Quantity
required to build
quantity
- Material
cost with optional
display of BOM
Labor
and Outside costs with:
Extension
TotalsBurden Costing for:
- Labor
- Materials
- Outside
Costs
Total
costs for material, labor,
outside processing, and burden
are displayed and totaled for a
final product cost per unit for
the quantity required. Gross
Margin Percentage can be
automatically calculated into the
sell price, also displayed on the
Product Cost Report.
Other
detailed reports to the terminal
or the printer show master file
information for parts, part
standards, and product
categories.
|